Every fall, right around the time the basement calls start, I get the other call too — the kitchen one. Usually it goes something like: “We watched a few shows this summer, we’re ready to do the kitchen, what’s this going to cost us?” And every time, the number in their head is lower than the number I’m about to give them. Not because I’m padding anything. Because HGTV doesn’t show you the electrical panel upgrade, the load-bearing wall that needs a steel beam, or the eight-week lead time on cabinets.

I’ve been doing this 25 years across Andover, Coventry, Tolland, Hebron, Marlborough, Glastonbury, Windham, and Colchester, and kitchens are the project I get asked about more than anything else. So here’s the real breakdown — what things actually cost, what drives the number up or down, and what I tell every homeowner before they sign anything.

The Three Tiers of Kitchen Remodels

Almost every kitchen job I price falls into one of three buckets. Where you land depends on whether you’re keeping the layout or changing it, and how far up the material scale you’re going.

Cosmetic Refresh: $15,000–$30,000

This is the kitchen that keeps its footprint. Same layout, same plumbing and electrical locations, nothing structural touched. You’re refacing or replacing cabinets in place, swapping laminate for a mid-grade quartz or granite counter, new sink and faucet, maybe new flooring over the existing subfloor, and a fresh coat of paint. I can usually get a homeowner into a real-looking new kitchen for $20,000–$25,000 in this tier if they’re not chasing high-end finishes. This is the fastest turnaround too — I’ve had these done start to finish in three to four weeks once material is on site.

Mid-Range Remodel: $35,000–$55,000

This is where most of my jobs land. New cabinets (not refaced — actually replaced), stone countertops, a tile backsplash, upgraded appliances, new flooring, and usually at least some electrical work — adding circuits for a microwave or induction range, maybe relocating a light or two. Sometimes it includes removing a half-wall or small non-structural wall to open things up to a dining area. Plan on six to eight weeks for this tier, longer if cabinets are custom or semi-custom rather than stock.

Full Gut / Layout Change: $60,000–$100,000+

This is the kitchen where the sink moves, the stove moves, maybe a wall comes out — including a load-bearing one — and you’re reworking plumbing rough-in, running new electrical circuits throughout, possibly moving gas lines, and sometimes extending the footprint into an adjacent mudroom or dining room. Custom cabinetry, high-end appliances, and full tile work push this number up fast. I did a kitchen in Glastonbury two years ago where we relocated the entire plumbing wall and added a 10-foot island with its own electrical and venting — that job landed just over $92,000, and every dollar of it was visible in the finished product. These jobs typically run eight to twelve weeks, and that’s assuming no surprises behind the walls.

What Actually Drives the Price

Homeowners usually fixate on countertops and cabinet doors. Those matter, but here’s what really moves the number:

  • Cabinets. Stock cabinets run roughly $150–$300 per linear foot installed. Semi-custom jumps to $300–$500. Full custom can run $600+ per linear foot. A typical kitchen needs 20–30 linear feet of cabinetry, so this is usually the single biggest line item on the job.
  • Countertops. Laminate is $20–$40 a square foot installed. Quartz, which is what most people end up choosing, runs $65–$90 a square foot installed. Natural granite is similar or a bit less depending on the slab. Exotic stone or waterfall edges push well past $100 a square foot.
  • Moving plumbing or gas lines. If the sink or range stays put, you save real money. Move either one, and you’re paying a plumber to re-rough the lines under the slab or through the floor joists, plus patching whatever you opened up to get there.
  • Structural changes. Taking out a wall between the kitchen and dining room sounds simple until you find out it’s load-bearing. Then you’re adding a steel or engineered beam, which means an engineer’s stamp, a permit, and often opening the ceiling to install it properly.
  • Electrical. Modern kitchens need more circuits than most 20- or 30-year-old homes have — dedicated circuits for the microwave, dishwasher, disposal, and often a second circuit for counter outlets per code. If your panel is maxed out, you may need a panel upgrade before any of that happens.
  • Appliances. These are purchased separately from the labor and material markup on the rest of the job, and the range is enormous — a basic appliance package might run $4,000–$6,000, while a package with a professional-style range and built-in refrigerator can run $15,000–$25,000 on its own.

Permits — Yes, You Need One

Most towns in eastern Connecticut require a building permit for kitchen work that touches electrical, plumbing, or structure — which covers nearly every remodel beyond a straight cabinet swap. If you’re adding circuits, moving a sink, or touching a wall, that’s a permit, full stop. I pull permits as part of every job I run; it’s a pass-through cost with no markup, and it protects you if you ever sell the house and an inspector or buyer’s attorney asks whether the work was permitted. Skipping it to save a few hundred dollars is one of the more expensive mistakes I see homeowners make when they try to go it alone with an unlicensed crew.

Lead Times Will Make or Break Your Schedule

Here’s the part nobody warns people about: the kitchen itself might take six weeks to install, but you could be waiting eight to twelve weeks just for cabinets to arrive, longer if you’re picking a custom door style or a less common finish. Countertop fabrication after template typically adds another two to three weeks once cabinets are set, because you can’t template stone until the cabinets are installed and level. I tell every client to order cabinets the day the design is finalized and the deposit is paid — not after demo starts. I had a job in Tolland a couple years back where the homeowner wanted to wait until the old kitchen was torn out to “see it empty” before finalizing cabinet selections. That indecision cost them five extra weeks without a working kitchen, because the cabinet order didn’t go in until demo was already done.

Practical Advice Before You Sign a Contract

  • Budget a 10–15% contingency. Once we open walls or pull up flooring in a house built before the 1990s, there’s a real chance of finding outdated wiring, undersized framing, or water damage nobody knew about. Most jobs don’t hit the contingency. Some do, and you want the cushion already in your plan instead of scrambling for it mid-project.
  • Decide on layout before you shop finishes. If you’re even considering moving the sink or changing the footprint, get that decided first. Picking cabinet colors before the layout is locked just means re-doing decisions later.
  • Get appliance specs before cabinet design is finalized. Cabinet openings need to match actual appliance dimensions. I’ve seen jobs where a homeowner upgraded to a wider range after cabinets were already ordered — that’s a costly redo.
  • Ask what’s included in “installed” pricing. Some counter and cabinet quotes don’t include removal and disposal of the old kitchen, which can run $1,500–$3,000 depending on what’s being hauled out.
  • Set up a temporary kitchen before demo day. A microwave, mini-fridge, and hot plate in the dining room or basement will save your sanity for the weeks you’re without a working kitchen.

What It Comes Down To

Most eastern Connecticut homeowners land somewhere between $35,000 and $55,000 for a real kitchen remodel — new cabinets, stone counters, updated electrical, and a kitchen that actually looks and functions differently than the one they had. The number moves up fast once you start moving plumbing, taking out walls, or going custom on cabinetry, and it moves down if you’re willing to keep the existing footprint and refinish rather than replace. Either way, the honest number is almost never the one from the home improvement show — it’s the one that accounts for your house’s actual wiring, actual plumbing, and actual walls.